Is your DC building meeting its BEPS standard? See what it could cost.
The first compliance cycle ends in 2026, and coverage now reaches buildings down to 10,000 sqft. Enter an address to see where it stands.
The Law, Plainly
A performance standard with real money behind it
BEPS sets a minimum performance level for each building type. Buildings below it have a cycle to close the gap, or face penalties based on floor area.
10,000
Square Feet
Buildings at or above this floor area, as of 2026.
$10
max penalty per sqft
Calculated on floor area, not tons of emissions.
2026
First cycle ends
Performance for the first cycle is measured against the standard.
coverage has expanded
Your building may be newly covered
The BEPS threshold has been phasing down. Earlier cycles started with larger buildings; as of 2026 it reaches 10,000 sqft, so many owners of smaller buildings are covered for the first time.
Earlier cycles
≥50,000 sqft
As of 2026
≥10,000 sqft
BEPS runs on your benchmarking data
Your BEPS standing comes from the energy data you report through DC Benchmarking. Late or incomplete benchmarking puts BEPS compliance at risk too.
How the penalties work
BEPS penalties scale with the size of the building
The rates are simple, but the totals get large quickly.
Up to $10
/ sqft
Missing the standard
The maximum penalty for a building that ends the cycle below its standard.
$1,000,000
What that looks like
$10/sqft on a 100,000 sqft building is $1M of exposure. This keeps going, up to a per-building maximum of $7,500,000.
Scales with progress
The penalty shrinks in proportion to how much of the required improvement you achieve by the end of the cycle. Cut energy use by half of what the Performance Pathway requires, and the penalty is roughly halved.
Maximum before any reduction for progress. Directional only.
Key Dates
2026 is when the first cycle closes
Buildings covered in the first cycle are measured at the end of 2026. Newly covered buildings need to know where they stand now.
2021
First cycle begins
Standards set by building type; buildings below standard start their cycle.
Dec 31, 2026
First cycle ends
Performance over the cycle is assessed against the standard.
2027
Results and penalties
Buildings that missed the standard face penalties, reduced for documented progress.
Next Cycle
Wider coverage
Buildings from 10,000 sqft are in scope.
Where Viaduct helps
Software won't cut your emissions. It keeps you from paying for avoidable mistakes.
Cutting carbon takes retrofits — new boilers, controls, envelope work. Viaduct handles the compliance work around them: accurate, on time, and defensible, so a filing error or a missed deadline never turns into a penalty you didn't have to pay.
File clean, on time
Every report validated before it goes out — so you avoid non-filing penalties and the errors that trigger them.
Protect Good Faith status
Keep the documentation trail DOB looks for in one place, so your grace path holds up if it's ever questioned.
Stop wrangling utility data
Pull and reconcile meter data automatically instead of chasing spreadsheets across accounts every reporting cycle.
See the whole portfolio
Know which buildings hit the 2030 cliff first, so capital planning follows the real exposure — not a guess.
What Viaduct won't do: promise to erase your penalty. If you're over your cap, the fix is fewer emissions. Viaduct makes the compliance work around that accurate, on time, and defensible.
Two Ways In
One building or five hundred.
A single building
Check it above, get the ungated result, and pull the full report to your inbox. Know your status, your limit, and your exposure in a few minutes.
Check my building
Managing a portfolio?
Run every building at once and see total exposure, filing status, and which properties hit the 2030 cliff first. We'll walk you through your portfolio, building by building.
Book a walkthrough
Not covered — or not yet
Own buildings elsewhere, or under the threshold today?
Viaduct tracks programs beyond Washington, DC. The same account covers every building you own. If you own buildings in Boston (BERDO) or NYC (LL97), similar emissions caps already apply. We'll tell you when a program starts to affect your buildings.
Get alerts when a program affects your buildings
Questions owners ask
BEPS, answered plainly.
Is my building covered now?
As of 2026, buildings of 10,000 sqft and up are covered. Earlier cycles started at 50,000 sqft, so smaller buildings may be covered for the first time.
When does the first cycle end?
In 2026. Performance over the cycle is then assessed against the standard.
How is the penalty calculated?
Up to $10 per square foot of floor area. On a 100,000 sqft building that is up to $1,000,000. Progress on a compliance pathway can reduce it.
How does BEPS relate to DC Benchmarking?
BEPS uses your benchmarking data. If benchmarking is late or wrong, so is your BEPS picture.
I'm newly covered. What should I do first?
Confirm your benchmarking is current, then check your score against the standard for your building type. That tells you how large the gap is.
Is the estimate on this page exact?
No. It uses public data and a simplified calculation. Treat it as directional, not as compliance advice.
Can Viaduct handle a whole portfolio?
Yes. Book a walkthrough and we will set up every DC building, plus buildings in other covered cities.